JOURNAL OF KUNMING METALLURGY COLLEGE ›› 2016, Vol. 32 ›› Issue (3): 49-53.DOI: 10. 3969/j. issn. 1009—0479.2016.03.010
Previous Articles Next Articles
JIAO Lili,TAO Fanghong
Received:
Online:
Published:
Abstract:
The main work of construction project management includes quality control, cost control, work schedule control, information management and so on, related to many units and departments, such as the design, construction, supervision, procurement and others. The overall organization and coordination play a crucial role in the project management, therefore slight negligence in the process of all the construction project management will lead to a lot of problems, such as: schedule delays, cost overrun, the poor quality assurance. These problems will bring down the efficiency of the construction project management. In this paper, the study was done to improve the efficiency of construction project management, and solve practical problems in this field. Firstly, based on the main characteristics of construction project. The existing construction project management problems were analyzed with the help of BIM technology (building information model) as a multi-sharing platform. Secondly, the study of BIM technology in the project design, construction and operation and maintenance management program optimization design, cost saving, was done to ensure that improve the organization and coordination, and other aspects of the application in the construction period. This article attempts to propose an effective way of solving the existing construction project management problems, and then improve the efficiency of construction project management.
Key words: BIM technology, construction engineering management, application process
CLC Number:
TU17|TU71
JIAO Lili,TAO Fanghong. Explore the Effective Way to Improve the Efficiency of Construction Management Based on BIM Technology[J]. JOURNAL OF KUNMING METALLURGY COLLEGE, 2016, 32(3): 49-53.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://kmyzxb.magtech.com.cn/EN/10. 3969/j. issn. 1009—0479.2016.03.010
http://kmyzxb.magtech.com.cn/EN/Y2016/V32/I3/49
[1]张连营,于飞.基于BIM的建筑工程项目进度—成本协同管理系统框架构建[J].项目管理技术,2014,12(12):43-46. [2]芦洪斌.BIM在建筑工程管理中的应用[D].大连:大连理工大学,2014. [3]彭正斌.基于BIM理念的建设项目全生命周期应用研究[D].青岛:青岛理工大学,2013. [4]师征.基于BIM的工程项目管理流程与组织设计研究[D].西安:西安建筑科技大学,2012. [5]梁琼.BIM技术在建筑工程管理中的应用[J].门窗,2014(10):208